Study on the maximum longitudinal slope and slope length of construction access roads in mountainous areas

International Journal of Research Studies in Education
CollabWritive Special Issue
Volume 13 Issue 7

Available Online:  15 June 2024

Author/s:

Ma, Xueqian
Philippine Christian University, Philippines (398760670@qq.com)

Abstract:

At present, the construction of highways in high mountainous areas is increasing, before the construction of bridges and tunnels in mountainous areas, the construction of right-of-way is an indispensable preparatory work, and the development of engineering construction programmes will rely heavily on the construction of right-of-way. In this paper, for the construction of domestic mountainous highway construction process of construction right-of-way index is low, poor quality of the status quo, this paper focuses on the study of mountainous areas of construction right-of-way maximum longitudinal slope and corresponding to the maximum length of the slope.

Keywords: highway, construction right-of-way, maximum longitudinal slope, maximum slope length, mountainous areas

PDF

DOI: https://doi.org/10.5861/ijrse.2024.24643

Cite this article:
Ma, X.  (2024). Study on the maximum longitudinal slope and slope length of construction access roads in mountainous areas. International Journal of Research Studies in Education, 13(7), 169-176. https://doi.org/10.5861/ijrse.2024.24643